Project Details

Location
Port of Sunderland
Client
PACS Marine Engineering
Type of Inspection
Magnetic Particle Inspection
Duration
1 Day

PACS Marine Engineering required Magnetic Particle Inspection to be carried out onboard the Inyanga Estsha Vessel at the Port of Sunderland. The Inspection was carried out pre and post load test on the Panther LARS deck spread, including the Winch bases, D Rings and Crane block pin.

Oculus Integrity Services provided a technician to complete the Inspection, this included completing all work scopes and issuing the final report to the client the same day.

Menu