Project Details

Location
Port of Dublin
Client
Rosen Europe
Type of Inspection
UT & Isometric Drawing
Duration
10 Days

Oculus Integrity Services supplied our client with a technician to assist their API 570 Inspector to carry out piping inspections on their client’s site.

Our technician carried out UT Thickness measurements at locations as requested by the Inspector also, the technician produced inspection Isometric line drawings for the Inspectors final report.

Menu