Project Details

Location
London
Client
SGE Group
Type of inspection
Ultrasonic Inspection
Duration
3 days

Oculus Integrity Services were subcontracted by Waterman Building Services to carry out Ultrasonic Inspection surveys at office buildings located in the centre of London, as part of a refurbishment project.

The inspection work formed part of their Scope of Works for a Validation and Tracing Services Survey. Oculus integrity Services carried out various Ultrasonic Thickness Inspections on pipelines throughout the building as part of this survey.

A full detailed Inspection report was produced and passed to Waterman Building Services to assist as part of their Scope of Works and final QA/QC documentation.

Menu